jonesbros
  Home | Accreditations | Contact | Case studies
jonesbrosnorthwales
With more than 50 years’ experience, the company has built a reputation for reliability, quality, flexibility and expertise.
landfill
LAND REMEDIATION
Project gallery
 
View our photo gallery

Our online gallery focuses primarily on a wide range of past and current projects
from wind farms and marinas to specialist surfacing and infrastructure: View more
renewable energy


 

 
   
land remediation

Landfill cell lining works/access road

We undertook a £1.8m contract for Biffa Waste Services Ltd in Houghton le Spring, Co Durham. It involved three main works:

Construction of a new access road within the landfill site.

Reprofiling of a 45m vertical height quarry face to produce a rock profile suitable for lining. Restricted width at the top of the rock face meant that a working platform had to be constructed out of excavated material, and moved as works progressed along the length of the quarry face. Some 400,000 tonnes of rock required excavating in order to extract 100,000 tonnes of rock for the reprofiling.

Lining of the rock face involved a steepwall design consisting of clay/geogrid/polystyrene tipform units/welded geomembrane liner & a geocomposite protection/gas venting layer.



 

Media centre

Jones Bros comments on gloomy Welsh construction forecast

27th January 2012
View more


Meet The Buyer Event – Pentland Road Windfarm

18th January 2012
View more


Jones Bros awarded Cob widening project

9th January 2012
View more


Jones Bros engineer in special photo presentation

13th December 2011
View more


MP blown away’ by Porthmadog bypass project

4 October 2011
View more


Jones Bros MD honoured at national awards

27 September 2011
View more


Civil engineers bring magic touch to trade show

23 September 2011
View more


View more news from the Jones Bros media centre

 

 
 
  Copyright: Jones Bros Ltd 2011 | Registered in England & Wales No: 983459 Site map | Training Site Development Eclipse Creative