jonesbros
  Home | Accreditations | Contact | Case studies
jonesbrosnorthwales
With more than 50 years’ experience, the company has built a reputation for reliability, quality, flexibility and expertise.
Jones Bros created fifty civil engineering jobs in North Wales
LAND REMEDIATION
Project gallery
 
View our photo gallery

Our online gallery focuses primarily on a wide range of past and current projects
from wind farms and marinas to specialist surfacing and infrastructure: View more
renewable energy


 

 



 
   
land remediation

Jones Bros Tywyn Coastal Defence Project


Background:

Tywyn’s coastal frontage has suffered storm damage in nearly every decade since the 1930s.
Over the last 100 years, the height and width of the beach has also receded. It is estimated that 78 homes in Tywyn are at risk of flooding every year.

The United Kingdom Climate Impacts Programme (UKCIP) and Marine Climate Change Impacts Partnership (MCCIP) predict an increase in storm severity and frequency in coming years.

Studies have estimated the residual life of the current defences is from two to five years.

Coastal defence:

The £6.4m Tywyn Coastal Defence Scheme is backed by £3.8m of Welsh Assembly Government money and £2.6m from the European Regional Development Fund.

It will include:
  • A rock armour breakwater at Warwick Place, with beach nourishment (addition of new beach material)
  • A rock groyne near Neptune Road
  • A rock groyne at Pier Road
  • A rock revetment at Bryn-y-mor
  • Replacement of the groyne field
  • Reconstruction or repair of the slipways and access steps, including the concrete steps along the length of the promenade and the rock revetment near the Warwick Place slipway.

Rock deliveries:

Around 60,000 tonnes of rock will be delivered by sea and road to shore up Tywyn’s sea defences. The majority of this rock will come from nearby Penmaenmawr, the rest will come from France and Norway. Two-thirds of the rock will be delivered by sea. The remainder – up to 20 loads a day – will arrive by road, between the hours of 7am and 7pm.

Latest News:

26 July 2010 - Seafront Criterium Races at Tywyn Saturday 31 July 2010

13 July 2010 - Tywyn community delivers a huge thank you to Jones Bros team

Further information:

Full information on the Tywyn Coastal Defence Scheme is now available at the dedicated Visitor Information Point, Warwick Place, Tywyn.

There will also be regular updates here at the Jones Bros website. Contracts manager Geraint Thomas can be contacted on 07787 100750.


Logos
Media centre

Jones Bros comments on gloomy Welsh construction forecast

27th January 2012
View more


Meet The Buyer Event – Pentland Road Windfarm

18th January 2012
View more


Jones Bros awarded Cob widening project

9th January 2012
View more


Jones Bros engineer in special photo presentation

13th December 2011
View more


MP blown away’ by Porthmadog bypass project

4 October 2011
View more


Jones Bros MD honoured at national awards

27 September 2011
View more


Civil engineers bring magic touch to trade show

23 September 2011
View more


View more news from the Jones Bros media centre

 

 
 
  Copyright: Jones Bros Ltd 2011 | Registered in England & Wales No: 983459 Site map Site Development Eclipse Creative