jonesbros
  Home | Training | Contact | Case studies
jonesbrosnorthwales
With more than 50 years’ experience, the company has built a reputation for reliability, quality, flexibility and expertise.
LAND REMEDIATION
Project gallery
 
View our photo gallery

Our online Gallery-focuses primarily on a wide range of past and current projects
from windfarms and marinas to specialist surfacing and infrastructure: View more
renewable energy


Case studies

Holyhead Terminal 3 Redevelopment for Stena.
View more

Southwold
View more

 
   
land remediation

Construction of a boating marina

Jones Bros developed a £3.3m boating marina at for Lifetime Projects Ltd at Deganwy, North Wales.

The marina consisted of rock breakwater with a sheet pile containment structure and a pre-cast concrete harbour wall surmounted on the piling.

The project also involved the construction of new access roads, a level crossing under Railtrack possessions, and associated drainage and infrastructure works.

A full environmental management system was implemented with detailed method statements covering pollution controls within the environmentally sensitive Conwy Estuary.


 

renewable energy News room

Jones Bros celebrates graduates

14 November 2008

Two employees with Ruthin based Jones Bros have graduated as civil construction engineers
View more

Holyhead’s Road to Regeneration
28 October 2008

£2 million road link in North Wales, as part of the £7m Parc Cybi infrastructrue scheme
View more

Marathon fitter Phil raises £2,300 for charity
27 June 2008

Jones Bros is celebrating the marathon efforts of one of its longest-serving members of staff.
View more
 
 
  Copyright: Jones Bros Ltd 2008 | Registered in England & Wales No: 983459 Site map Site Development Eclipse Creative